Skip to main content
6NN6C SEO & GEO research
About this site

Why does the author take on at most 3 projects at a time?

Short answer

Enough to decide

It is simple division: each long-term project takes 8–10 hours a week.

Those 8–10 hours break down as about 2 hours maintaining and checking the daily citation sampling, about 4 hours of diagnosis and data analysis, and about 3 hours of review meetings and communication. Add about 20 hours a month of fixed research for this site (engine sampling, writing the research log, updating data snapshots), divide the working hours available in a week, and 3 is the most projects that can each be delivered to that standard.

What this means for you

“At most 3” is not scarcity marketing; it is a limit worked out from the hours. A fourth project would dilute the quality of every project.

On this page Supporting evidenceRevision historyRelated notes & questionsComment

Supporting evidence

Two things you can check for yourself.

  1. 1
    5–7 working daystime for one project’s diagnosis stage

    The diagnosis produces a checklist that goes item by item through the seven-stage search framework. The time this one step takes shows how much each project demands.

  2. 2
    The research is on the record

    The monthly research for this site is not just talk: everything it produces is in the research log with timestamps, and the status figures on the home page are updated every month.

Revision history

  1. v12026-09-10

    First published.

Comment

Seeing different results on your site? Write it down — it will be checked.

Check your site with the SEO basics check

12 checks, results in seconds, no email. Bring the results back and compare them with the conclusions here.